PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed conduit at column K-2.5 Facing West (800x600).jpg Welding Derrick -2 3rd Floor Facing West (800x600).jpg Excavate around Steel column G-2.5 and G-1.9 Facing South  (800x600).jpg Erecting Derrick -3 Facing South (800x600).jpg Erecting Derrick -3 Facing West (800x600).jpg Pouring concrete at foundation wall along column line 6.5 Facing East (800x600).jpg Pouring concrete at Foundation wall along column line 6.5 Facing South-West (800x600).jpg Poured concrete at Foundation walls and footings at column line 6.5 (G-C.7) Facing East (800x600).jpg Bolting Derrick -3 Facing East (800x600).jpg
Previous pageNext page Erecting Derrick -3 Facing West (800x600)
Erecting Derrick -3 Facing West (800x600)